Table 4: Slope change after construction of PSWC measures in highlands of Ethiopia.
PSWC Structure |
Study site |
Age (Year) |
plot |
Before (%) |
After (%) |
Slope change (%) |
Refrencess |
Stone bund |
Maego Watershed |
7 |
50 |
15.54 |
11 |
29.2% |
Dimtsu, et al. [20]
|
Stone bund+ Trench |
Maego Watershed |
7 |
50 |
20 |
15 |
25% |
|
Stone bunds |
Dogu’a Tembien district |
> 3 |
202 |
14.1 |
11.2 |
20.6% |
Gebremichael, et al. [13] |
Soil bund |
Banja Shikudad District, |
9 |
4 |
21 |
12 |
42.8% |
Amdemariam, et al. [26] |
Stone-faced soil bund |
Lole Watershed |
10 |
3 |
19.5 |
8 |
58.9% |
Guadie, et al. [27]
|
Soil bund |
Lole Watershed |
10 |
3 |
19.5 |
7.16 |
63.2% |