Table 9: Capex and Opex of the Z-well activated by the ESP.
SERVICES (CAPEX) |
Cost ($) |
ESP equipment |
200,000$ |
Tax |
0.30% |
OPEX |
Cost ($) |
ESP maintenance |
30,000$ |
Water treatment |
85,000$ |
Oil cost |
8$ |
Price per barrel |
95$ |
Energy costs |
25$ |