Table 8: Test result of workability of fresh blended concrete sample.

Mixed code

Replacement of IMSW

solid waste fly ash

OPC

W/C

(%)

Observed slump (mm)

RF@0

0%

100%

26

35

RF@5

5%

95%

27

30

RF@10

10%

90%

29

25

RF@15

15%

85%

29.6

23

RF@20

20%

80%

31.5

21

RF@25

25%

75%

32

18

RF@30

30%

70%

33

15

RF@35

35%

65%

33.2

14