Table 3: Correlation of pumped and the estimated transmissivity.
VES points |
Well Name |
Pumped T(m2/day ) |
Estimated T’(m2/day ) |
VES-3 |
BH-3 |
398.2 |
363.8 |
VES-6 |
BH-4 |
93.7 |
63.79 |
MVES-1 |
BH-5 |
123.45 |
121.7 |
MVES-9 |
BH-6 |
305 |
302.06 |
MVES-6 |
BH-7 |
488 |
389.8 |