Table 2: Correlation of pumped and the estimated hydraulic conductivity.
VES POINTS |
Well name |
Pumped k(m/day) |
Estimated ′ (m/day) |
VES-3 |
BH-3 |
1.66 |
1.33 |
VES-6 |
BH-4 |
1.39 |
0.99 |
MVES-1 |
BH-5 |
1.01 |
0.76 |
MVES-9 |
BH-6 |
1.32 |
1.28 |
MVES-6 |
BH-7 |
1.22 |
1.18 |