Table 2: Correlation of pumped and the estimated hydraulic conductivity.

VES POINTS

Well name

Pumped k(m/day)

Estimated ′ (m/day)

VES-3

BH-3

1.66

1.33

VES-6

BH-4

1.39

0.99

MVES-1

BH-5

1.01

0.76

MVES-9

BH-6

1.32

1.28

MVES-6

BH-7

1.22

1.18