Table 1: % Recoveries of the internal standard- mirex, added to core sediment sections from Bao Shan (Site B), Bai Long Gang (site C), and a selected range of priority pollutants added to core sediment originating from Dong Hai Nong Chang (site E).
Core sediment Sample, Depth, Cm | % Recovery of mirex | Priority pollutant recovered | % Recoverya |
Site B | Site E | ||
35 | 105.6 | 105.6 | 90 |
35 | 107.6 | Anthracene | 68 |
35 | 85.3 | 1,3-Dichlorobenzene | 125 |
Site C | 1,2-Dichlorobenzene | 150 | |
1 | 84a | Diethyl phthalate | 116 |
3 | 84 | Hexachlorobenzene | 82 |
5 | 134 | Pyrene | 132 |
7 | 111 | ||
9 | 100 | ||
13 | 146 | ||
17 | 68 | ||
25 | 38 | ||
53 | 103 |
asingle point determination.