Table 1: % Recoveries of the internal standard- mirex, added to core sediment sections from Bao Shan (Site B), Bai Long Gang (site C), and a selected range of priority pollutants added to core sediment originating from Dong Hai Nong Chang (site E).

Core sediment Sample, Depth, Cm % Recovery of mirex Priority pollutant recovered % Recoverya
Site B Site E
35 105.6 105.6 90
35 107.6 Anthracene 68
35 85.3 1,3-Dichlorobenzene 125
Site C 1,2-Dichlorobenzene 150
1 84a Diethyl phthalate 116
3 84 Hexachlorobenzene 82
5 134 Pyrene 132
7 111
9 100
13 146
17 68
25 38
53 103

asingle point determination.